The restoration work in our basement is finally moving forward with the installation of the new tile floor this week.
4 months ago, a water main leak destroyed our hardwood floor, and although the leak was repaired shortly after, the restoration work was since then on hold, waiting for the fast and responsive insurance (being sarcastic here) to do its thing...